Existing client contacted Network Construction services regarding issues with existing timber flooring. After Network carried out a detailed inspection of the sub floor, the following items were found to defective.
Whites ants infestation
Lack of drainage to the perimeter walls
Foundation clearance only 200mm which does not meet code requirements.
Previous builder have left timber debris within sub floor
No ant cap installed to perimeter walls
Network's team of tradesmen are now underway with the rectification works.